Generates a stratified random sampling calendar for a creel survey season.
The season is divided into weekday and weekend strata, and days are
randomly selected within each stratum. Output is a creel_schedule tibble
ready to pass to creel_design().
Usage
generate_schedule(
start_date,
end_date,
n_periods,
n_days = NULL,
sampling_rate = NULL,
period_labels = NULL,
expand_periods = TRUE,
include_all = FALSE,
ordered_periods = FALSE,
period_intensity = NULL,
seed,
special_periods = NULL,
periods_per_day = NULL,
period_allocation = c("balanced", "random"),
periods = NULL,
day_start = "00:00",
weekend_days = NULL
)Arguments
- start_date
Character or Date. First day of the survey season (ISO 8601 "YYYY-MM-DD").
- end_date
Character or Date. Last day of the survey season (ISO 8601 "YYYY-MM-DD").
- n_periods
Integer. Number of sampling periods per day.
- n_days
Named integer vector of days to sample per stratum (e.g.,
c(weekday = 20, weekend = 10)), or a scalar applied uniformly to all strata. Mutually exclusive withsampling_rate.- sampling_rate
Named numeric vector of sampling fractions per stratum (e.g.,
c(weekday = 0.3, weekend = 0.6)), or a scalar applied uniformly to all strata. Mutually exclusive withn_days.- period_labels
Optional character vector of length
n_periodswith human-readable period names. When supplied,period_idis character (or ordered factor ifordered_periods = TRUE).- expand_periods
Logical (default
TRUE). IfTRUE, output has one row per sampled day x period (nrow = sampled_days * n_periods). IfFALSE, output has one row per sampled day andperiod_idis omitted.- include_all
Logical (default
FALSE). IfTRUE, all season dates are returned with asampledlogical column. IfFALSE, only sampled dates are returned.- ordered_periods
Logical (default
FALSE). IfTRUEandperiod_labelsis supplied,period_idis an ordered factor preserving label order.- period_intensity
Not yet implemented. Must be
NULL.- seed
Integer seed for reproducible random day selection. Uses
withr::with_seed()to avoid mutating global RNG state.- special_periods
Optional data frame declaring calendar-defined special periods. Must contain
start_date,end_date, andlabelcolumns, with optionalreason. Periods are expanded to day-level assignments before sampling so boundary-crossing periods are split by civil date.- periods_per_day
Integer. How many of the
n_periodsperiods (shifts) are worked on each sampled day.NULL(default) means all of them, as before. With fewer, the worked periods are drawn at random for each sampled day and each row records its selection probability inp_period(periods_per_day / n_periods), e.g. one of two shifts givesp_period = 0.5. Needsexpand_periods = TRUE.- period_allocation
How the worked periods are drawn when
periods_per_day < n_periods."balanced"(default): within each stratum the periods are dealt to the sampled days in random order, so the number of days per period differs by at most one (e.g. 5 morning + 5 evening over 10 weekdays)."random": an independent draw for each day. Under both, every period has the same chance,p_period, of being worked on any sampled day. The variance estimators treat the draws as independent, which is conservative for"balanced".- periods
Optional data frame of shift times:
period_id(one row per period, matchingperiod_labels, or 1 ton_periods),start_timeandend_timeas"HH:MM". Addsshift_startandshift_endto every row. With adatecolumn the times vary by day – one row per date and period, covering every worked date – as returned bydaylight_shifts()for shifts bounded by sunrise and sunset. Times are read on the survey-day clock that starts atday_start, and each shift must fall inside one survey day. An optionalhourscolumn (asdaylight_shifts()returns) gives each shift's real elapsed length and is kept asshift_hours; it differs from the clock length only across a daylight-saving change.- day_start
Clock time (
"HH:MM") at which a survey day begins. The default"00:00"is the calendar day, as before. For night creels whose shifts cross midnight, choose a time no shift spans, e.g."12:00": then 19:30-00:30 and 00:30-06:00 are the two halves of one night, dated by the date the night starts. A shift time earlier thanday_startis on the next calendar day. The schedule records it in aday_startcolumn. Used as the calendar ofcreel_design(), it makes a night design, which maps counts and interviews to the night they belong to.- weekend_days
Day names (full or three-letter English, any case) whose survey days form the
weekendstratum.NULL(default) means Saturday and Sunday, and is only allowed whenday_start = "00:00": a night is dated by the day it starts, so with that default a Friday night would be a weekday, and agencies differ on which nights are the weekend (e.g.c("Friday", "Saturday")).
Value
A creel_schedule data frame with columns:
date(Date): Sampled (or all) dates.day_type(character): Baseline "weekday" or "weekend" classification.final_stratum(character): Present whenspecial_periodsis supplied; gives the final stratum used for day selection.special_period_reason(character): Present whenspecial_periodsis supplied; gives the optional reason for the special-period assignment.period_id(integer, character, or ordered factor): Period within day. Absent whenexpand_periods = FALSE.p_period(numeric): Probability that the period was the one worked that day:1when every period is worked,periods_per_day / n_periodswhen they are drawn,NAon unsampled days. Absent whenexpand_periods = FALSE.shift_start,shift_end(character, "HH:MM"): Present whenperiodsis supplied.shift_hours(numeric): Present whenperiodshas anhourscolumn.day_start(character, "HH:MM"): Present whenday_startis not"00:00".sampled(logical): Present only wheninclude_all = TRUE.
Examples
# Basic schedule with stratified sampling rates
sched <- generate_schedule(
start_date = "2024-06-01",
end_date = "2024-08-31",
n_periods = 2,
sampling_rate = c(weekday = 0.3, weekend = 0.6),
seed = 42
)
# Use result with creel_design()
creel_design(sched, date = date, strata = day_type)
# One of two shifts worked on each sampled day, drawn at random
shifts <- generate_schedule(
start_date = "2024-06-01",
end_date = "2024-08-31",
n_periods = 2,
period_labels = c("AM", "PM"),
sampling_rate = c(weekday = 0.3, weekend = 0.6),
periods_per_day = 1,
periods = data.frame(
period_id = c("AM", "PM"),
start_time = c("06:00", "13:00"),
end_time = c("13:00", "20:00")
),
seed = 42
)
head(shifts)
#> # A creel_schedule: 6 rows x 6 cols (6 days, 2 periods)
#> June 2024
#> | Sun | Mon | Tue | Wed | Thu | Fri | Sat |
#> |----------|----------|----------|----------|----------|----------|----------|
#> | | | | | | | WEEKE |
#> | WEEKE | 03 | 04 | WEEKD | 06 | WEEKD | WEEKE |
#> | WEEKE | 10 | 11 | 12 | 13 | 14 | 15 |
#> | 16 | 17 | 18 | 19 | 20 | 21 | 22 |
#> | 23 | 24 | 25 | 26 | 27 | 28 | 29 |
#> | 30 | | | | | | |